CHECK AND TEST 1
Unscrew hinge cover.
Remove the cover.
Disconnect the terminals.
Check to see whether wires under hinge cover are broken.
Check if earthing wires are loose.
DIAGNOSIS 1
PROCEDURE 1
Cut off the wire.
Peel off the sleeves.
Make sure wires are in proper order and connect them.
Tin soldering.
Cover connecting point with electrical tape.
CHECK AND TEST 2
Power on and perform a leakage test. Put one detector on earthing wire of socket, and another detector on edge of side panel without paint.
DIAGNOSIS 2
PROCEDURE 2
CHECK AND TEST 3
DIAGNOSIS 3
PROCEDURE 3
CHECK AND TEST 4
PROCEDURE 4