CHECK AND TEST 1

Step 1

Unscrew hinge cover.


Step 2

Remove the cover.


Step 3

Disconnect the terminals.

Step 4

Check to see whether wires under hinge cover are broken.
Check if earthing wires are loose.

DIAGNOSIS 1

PROCEDURE 1

Step 1

Cut off the wire.

Step 2

Peel off the sleeves.

Step 3

Make sure wires are in proper order and connect them.

          Step 4

            Tin soldering.


Step 5

Cover connecting point with electrical tape.

CHECK AND TEST 2

Step 1

Power on and perform a leakage test. Put one detector on earthing wire of socket, and another detector on edge of side panel without paint.

DIAGNOSIS 2


PROCEDURE 2


Step 1

Remove central screw
cover.

Step 2

Loosen 2 screws
of terminal cover in
anticlockwise direction.

CHECK AND TEST 3


Step 1

testo testo

DIAGNOSIS 3


PROCEDURE 3


Step 1

Cut off the wire.

Step 2

Peel off the sleeves.

Step 3

Make sure wires are
in proper order and
connect them.

Step 4

Tin soldering.

Step 5

Cover connecting point
with electrical tape.

CHECK AND TEST 4

Step 6

Power on and perform a
leakage test.
Put one detector on
earthing wire of socket,
and another detector
on edge of side panel
without paint.

PROCEDURE 4