CHECK AND TEST 1

Note


Step 1

Discharge refrigerant:
1) Use pliers to cut off charging tube.
2) Discharge all refrigerant toward the exhaust vent.

Step 2

Melt brazing material with flame and pull processing tube out using a pair of pliers.

Step 3

Re-braze a copper tube onto processing tube of compressor.

Re-braze a copper tube
onto processing tube of
compressor.
To get more details on
brazing requirements,
please go to Annex b1

Note


Step 4

Install quick connector onto rebrazed pipe.

Step 5

Inject nitrogen of 1.57Mpa through quick connector into pipe.

Step 6

Test brazed joints in compressor niche for leaks with soapy water.

DIAGNOSIS 1

PROCEDURE 1

Note

Step 1

Clean paint off of brazed joint.

Step 2

Cut off brazed joint with leakage.

Step 3

Use a bigger copper tube to connect 2 ends of brazed joint.

Step 4

Braze the 2 ends.Please get more details of brazing requirements on Annex B1.

CHECK AND TEST 2

Step 1

Inject 1.57Mpa nitrogen through quick connector into pipe and apply soapy water to test for leaks again.

DIAGNOSIS 2

PROCEDURE 2

Step 1

Remove all drawers.

Step 2

Remove all shelves.

Step 3

Remove the vertical partition plate:
a. Insert 2mm slotted screwdriver into the gap.
b. Lever up the cover plate from bottom.

c. Insert 2mm slotted screwdriver into the side gap;
d. Lever up the cover plate from bottom;

e. Pull the bottom end of cover out;
f. Pull the top of the cover out;

g. Take pipes out and pull them into a horizontal position;
h. Push the latch down and lift top out of the cavity;

i. Push the latch up and pull bottom out of the cavity;
j. Pull the partition outward and remove partition;

k. View of interior once partition has been removed.

Step 4

Dismantle the air duct.

a. Hold the bottom of air duct;
b. Pull air duct out from below;

c. Disconnect the terminal for fan motor;
d. Disconnect the terminal of freezer temp. sensor;

e. Remove air duct.

DIAGNOSIS 3

PROCEDURE 3

Note


Step 1

Clean paint off of brazed joint.

Step 2

Cut off brazed joint with leakage.

Step 3

Use a bigger copper tube to connect 2 ends of brazed joint.

Step 4

Braze the 2 ends.Please get more details of brazing requirements on Annex B1

CHECK AND TEST 3

Step 1

Inject 1.57Mpa nitrogen through quick connector into pipe and apply soapy water to test for leaks again.

DIAGNOSIS 4

CHECK AND TEST 4

Step 1

Braze a piezometer onto processing tube of compressor.

Step 2

Charge nitrogen of 1.57Mpa through quick connector into pipe.

Step 3

Perform leakage test on brazing points and piezometer.

DIAGNOSIS 5

CHECK AND TEST 5

Step 1

Check to find possible leakage point.

DIAGNOSIS 6

PROCEDURE 4

Note


Step 1

Clean paint off of brazed joint.

Step 2

Cut off brazed joint with leakage.

Step 3

Use a bigger copper tube to connect 2 ends of brazed joint.

Step 4

Braze the 2 ends.Please get more details of brazing requirements on Annex B1.

CHECK AND TEST 6

Step 1

Inject 1.57Mpa nitrogen through quick connector into pipe and apply soapy water to test for leaks again.

DIAGNOSIS 7

PROCEDURE 5

Tip 1

When installing the air duct, make sure to move wires out of the way to prevent crushing by air duct.

Tip 2

After pushing the air duct into position, you should hear a click sound. If not, repeat again.

Tip 3

Check to see if there is a wide gap between air duct and cabinet.
IF SO, install air duct again.

Tip 4

Check to make sure latches are inserted into cavities properly.

Tip 5

First, insert top of cover plate into the gap, then bend plate to insert bottom end. Lastly, push middle into slot.

PROCEDURE 6

Step 1

Clean paint off of brazed joint of drying filter.

Step 2

Cut off the brazed joint of drying filter.

Step 3

Cut off capillary and remove the cut end by shaking.

Step 4

Braze on a new drying- filter.

Step 5

Inject nitrogen (1.57Mpa) through quick connector into pipe for at least 3 min to blow remaining refrigerant away.

Step 6

Add quick connector onto processing pipe of drying-filter.

Step 7

Perform leakage test on brazed joints of drying- filter and compressor processing pipe.

Step 8

Vacuum and recharge.Please get more details
of vacuuming and gas charging
requirements on Annex B2.

Step 9

Block processing pipe twice by locking pliers.

Step 10

Leave locked pliers attached to second block and shake to cut off the remaining pipe.

Step 11

Braze the ends and remove the pliers.