CHECK AND TEST 1

Step 1

Check if the power cord in the compressor room is damaged.

DIAGNOSIS 1

PROCEDURE 1

Step 1

Cut off the wire.

Step 2

Peel off the sleeves.

Step 3

Make sure wires are in proper order and connect them.

Step 4

Tin soldering.

Step 5

Cover connecting point with electrical tape.

CHECK AND TEST 2

Step 6

Power on and perform a leakage test.
Put one detector on earthing wire of socket, and another detector on processing pipe.

DIAGNOSIS 2