PROCEDURE 1
CHECK AND TEST 1
Check whether the tray is full of water.
DIAGNOSIS 1
PROCEDURE 1
Replace existing tray with a larger one.
PROCEDURE 2
PROCEDURE 2
Discharge all refrigerant
toward the exhaust vent.
Re-braze a copper tube onto compressor processing tubeClick below link to get more details for brazing requirements, go to Annex B1
Install quick connector onto rebrazed pipe.
PROCEDURE 3
Clean paint off brazed joint of drying-filter.
DIAGNOSIS 4