CHECK AND TEST 1


Note


Step 1

Discharge refrigerant: Use a pair of pliers to cut off the charging tube.

Step 2

Discharge all refrigerant toward the exhaust vent.

Step 3

Melt brazing material with flame and pull out processing tube using a pair of pliers.

Step 4

Re-braze a copper tube onto processing tube of compressor.

To get more details on brazing requirements, please go to Annex B1

Step 5

Install quick connector onto processing pipe.

Step 6

Use pliers to cut the capillary off.

Step 7

Inject nitrogen (1.57Mpa) through quick connector into pipe.

Step 8

Check to see if gas is blowing out of capillary.

DIAGNOSIS 1


PROCEDURE 1


Step 1

Clean paint off brazed joint of drying-filter.

Step 2

Cut off drying-filter.

Step 3

Cut off capillary and shake to remove the cut end.

Step 4

Braze on a new drying-filter.

Step 5

Inject nitrogen (1.57Mpa) through quick connector into pipe for at least 3 min to blow remaining refrigerant away.

Step 6

Add quick connector onto processing pipe of drying-filter.

Step 7

Perform leakage test on brazed joints of drying- filter and compressor processing pipe.

Step 8

Vacuum and recharge.

Step 9

Block processing pipe twice with locking pliers.

Step 10

Leave locked pliers attached to second block and shake to cut off the remaining pipe.

Step 11

Braze the ends and remove the pliers.

CHECK AND TEST 2