CHECK AND TEST 1

Note 


Step 1

Discharge refrigerant:

1) Use pliers to cut off charging tube.

2) Discharge all refrigerant toward the exhaust vent. 

Step 2

Melt brazing material with flame and pull processing tube out using a pair of pliers. 

Step 3

Re-braze a copper tube onto processing tube of compressor.

To get more details on brazing requirements, please go to page 682 

Note


Step 4

Install quick connector onto rebrazed pipe. 

Step 5

Inject nitrogen of 1.57Mpa through quick connector into pipe. 

Step 6

Test brazed joints in compressor niche for leaks with soapy water. 

DIAGNOSIS 1


PROCEDURE 1


Step 1

Clean paint off of brazed joint. 

Step 2

Cut off brazed joint with leakage

Step 3

Use a bigger copper tube to connect 2 ends of brazed joint.

Step 4

Braze the 2 ends. Please get more details of brazing requirements on page 682 

Note

CHECK AND TEST 2

Step 1

Inject 1.57Mpa nitrogen through quick connector into pipe and apply soapy water to test for leaks again.

Step 2

Check gas leakage with soapy water again at all brazed joints in compressor niche. 

DIAGNOSIS 2


PROCEDURE 2


Step 1

Remove all freezer drawers. 

Step 2

Remove all glass shelves. 

Step 3

Unscrew the screws on air duct.

a. Check the freezer air duct to find the three screw covers.

b. Remove the screw covers (total of three) on the air duct with slotted screw driver. 

c. Unscrew the screws (total three) with Cross-head screw driver. 

Step 4

Dismantle the air duct.

a. Catch the bottom of air duct and pull down the air duct. 

b. Pay attention to the connectors

when pulling out the air duct. 

c. Disconnect the terminal for fan motor.

Disconnect the terminal for freezer temp. sensor. 

d. Move the air duct out of the freezer compartment.

CHECK AND TEST 3

Step 1

Inject 1.57Mpa nitrogen through quick connector into pipe and check gas leakage behind freezer air duct. 

DIAGNOSIS 3


PROCEDURE 3


Step 1

Clean paint off of brazed joint. 

Step 2

Cut off brazed joint with leakage

Step 3

Use a bigger copper tube to connect 2 ends of brazed joint. 

Step 4

Braze the 2 ends. Please get more details of brazing requirements on page 682 

Note

CHECK AND TEST 4

Step 1

Inject 1.57Mpa nitrogen through quick connector into pipe and check gas leakage behind freezer air duct. 

DIAGNOSIS 4


CHECK AND TEST 5

Step 1

Braze a piezometer onto processing tube of compressor. 

Step 2

Charge nitrogen of 1.57Mpa through quick connector into pipe. 

Step 3

Perform leakage test on brazing points and piezometer to make sure all connection points are in good condition. 

DIAGNOSIS 5


PROCEDURE 4


Tip 1

Make sure the sealing sponges are in good condition. 

Tip 2

When reinstalling the air duct, fasten the wires to avoid crushing with air duct. 

Tip 3

Install the top side first when installing the air duct. 

Tip 4

After pushing air duct into place, you should hear a clicking sound. If not, repeat again.

Tip 5

Check to see if there is
a wide gap between air duct and cabinet. If there is, reinstall air duct. 

 

PROCEDURE 5


Step 1

Clean paint off of brazed joint of drying filter. 

Step 2

Cut off the brazed joint of drying filter. 

Step 3

Cut off capillary and remove the cut end by shaking. 

Step 4

Braze on a new drying-filter.

Step 5

Inject nitrogen (1.57Mpa) through quick connector into pipe for at least 3 min to blow remaining refrigerant away. 

Step 6

Add quick connector onto processing pipe of drying-filter. 

Step 7

Do leakage test on brazed joints of drying-filter and processing pipe on compressor. 

Step 8

Vacuum and recharge.

Click below link to get more details for vacuuming and gas- charging requirements, on page 688 

Step 9

Block processing pipe twice by locking pliers. 

Step 10

Leave locked pliers attached to second block and shake to cut off the remaining pipe.

Step 11

Braze the ends and remove the pliers. 

CHECK AND TEST 6


DIAGNOSIS 6


GO BACK TO COMPONENT LIST