CHECK AND TEST 1
Check whether the tray is full of water.
DIAGNOSIS 1
PROCEDURE 1
Replace existing tray with a larger one.
DIAGNOSIS 1
PROCEDURE 2
Discharge refrigerant. Cut off the charging tube with a pair of pliers.
Discharge all refrigerant toward the exhaust vent.
Cut off exhaust pipe.
Braze on an evaporating pipe.
Insert the pipe into the tray. Use a pipe connect old tray and new tray.
PROCEDURE 3
Melt brazing material with flame and pull out processing tube using a pair of pliers.
Re-braze a copper tube onto compressor processing tubeClick below link to get more details for brazing requirements, go to Annex B1
Install quick connector onto rebrazed pipe.
Clean paint off brazed joint of drying-filter.
DIAGNOSIS 2