NO-FROST
CROSS 4-DOOR WITH INVERTER COMPRESSOR
CROSS 4-DOOR WITH NORMAL COMPRESSOR
TOP MOUNT WITH INVERTER COMPRESSOR
TOP MOUNT WITH NORMAL COMPRESSOR
TOP MOUNT WITH NORMAL COMPRESSOR
(US Style)
FRENCH 4-DOOR WITH INVERTER COMPRESSOR
FRENCH 4-DOOR WITH NORMAL COMPRESSOR
COMBI WITH NORMAL COMPRESSOR
COMBI WITH INVERTER COMPRESSOR
COMBI WITH NORMAL COMPRESSOR E-DAMPER
SIDE BY SIDE WITH INVERTER COMPRESSOR
SIDE BY SIDE WITH NORMAL COMPRESSOR
SINGLE-DOOR FREEZER
(EU Style)
SINGLE-DOOR FREEZER
(US Style)
SINGLE-DOOR LARDER
(EU Style)
DEFROST
COMBI
TOP MOUNT
CHEST FREEZER
SINGLE-DOOR FRIDGE
SINGLE-DOOR FREEZER
SINGLE-DOOR LARDER
BUILT-IN COMBI
BUILT-IN TOP MOUNT
BUILT-IN ELECTRONIC SINGLE-DOOR LARDER
BUILT-IN ELECTRONIC SINGLE-DOOR FRIDGE
BUILT-IN MECHANIC SINGLE-DOOR LARDER
BUILT-IN MECHANIC SINGLE-DOOR FRIDGE
FROST FREE
COMBI WITH INVERTER COMPRESSOR
COMBI WITH NORMAL COMPRESSOR
SUPPORT
LOG-OUT
CHECK AND TEST 1
Note
Step 1
Discharge refrigerant:
1) Use pliers to cut off charging tube.
2) Discharge all refrigerant toward the exhaust vent.
Step 2
Melt brazing material with flame and pull processing tube out using a pair of pliers.
Step 3
Re-braze a copper tube onto processing tube of compressor.
To get more details on brazing requirements, please go to the
10.4 Annex B1
Note
Step 4
Install quick connector onto rebrazed pipe.
Step 5
Inject nitrogen of 1.57Mpa through quick connector into pipe.
Step 6
Test brazed joints in compressor niche for leaks with soapy water.
DIAGNOSIS 1
PROCEDURE 1
Note
Step 1
Clean paint off of brazed joint.
Step 2
Cut off brazed joint with leaking.
Step 3
Use a bigger copper tube to connect 2 ends of brazed joint.
Step 4
Braze the 2 ends.
Please get more details
of brazing requirements on
10.4 Annex B1
CHECK AND TEST 2
Step 1
Inject 1.57Mpa nitrogen through quick connector into pipe and apply
soapy water to test for leaks again.
DIAGNOSIS 2
CHECK AND TEST 3
Step 1
Braze a piezometer onto processing tube of compressor.
Step 2
Charge nitrogen of 1.57Mpa through quick connector into pipe.
StepĀ 3
Perform leakage test on brazing points and piezometer.
DIAGNOSIS 3
PROCEDURE 2
Step 1
Clean paint off of brazed joint of drying filter.
Step 2
Cut off the brazed joint of drying filter.
Step 3
Cut off capillary and remove the cut end by shaking.
Step 4
Braze on a new dryingfilter.
Step 5
Inject nitrogen (1.57Mpa) through quick connector into pipe for at least 3 min to blow remaining refrigerant away.
Step 6
Add quick connector onto processing pipe of drying-filter.
Step 7
Do leaking test on brazed joints of drying-filter and processing pipe on compressor.
Step 8
Vacuum and recharge. Please get more details of vacuuming and gascharging requirements on
10.5 Annex B2
.
Step 9
Block processing pipe twice by locking pliers.
Step 10
Leave locked pliers attached to second block and shake to cut off the remaining pipe.
Step 11
Braze the ends and remove the pliers.
DIAGNOSIS 4