Note


CHECK AND TEST 1

Step 1

Discharge refrigerant: cut off the charging tube with pliers.

Step 2

Discharge all refrigerant toward the exhaust vent.

Step 3

Melt brazing material with flame and pull out processing tube using a pair of pliers.

Step 4

Re-braze a copper tube onto compressor processing tube.
Click below link to get more details for brazing requirements, go to Annex B1

Note


Step 5

Install quick connector onto re-brazed pipe.

Step 6

Cut off suction pipe and exhaust pipe.

Step 7

Power up the compressor and feel the exhaust pressure from the exhaust pipe with a piece of paper.

Step 8

Feel the suction pressure of the suction pipe using a piece of paper.

DIAGNOSIS 1

PROCEDURE 1

Step 1

Unscrew terminal cover.


Step 2

Remove terminal cover.

Step 3

Disconnect all terminals.

Step 4

Unscrew earthing wire.

Step 5

Unscrew nut of compressor.

Step 6

Install a new compressor and tighten nuts onto compressor.

Step 7

Braze the joints of suction and exhaust pipes.

PROCEDURE 2

Step 1

Re-braze a copper tube onto compressor processing tube.

Step 2

Install quick connector onto re-brazed pipe.

Step 3

Clean paint off of brazed joint of drying filter.

Step 4

Cut off drying-filter.

Step 5

Cut off capillary and shake to remove the cut end.

Step 6

Braze on a new drying- filter.

Step 7

Inject nitrogen (1.57Mpa) through quick connector into pipe for at least
3 min to blow remaining refrigerant away.

Step 8

Add quick connector onto processing pipe of drying-filter.

Step 9

Perform leakage test on brazed joints of drying- filter and compressor processing pipe.

Step 10

Vacuum and recharge.
Click below link to get more details for vacuuming and gas- charging requirements, go to Annex B2

Step 11

Block processing pipe twice by locking pliers.

Step 12

Leave locking pliers on the second block and cut off the rest of the pipe by shaking.

Step 13

Braze the ends and remove the pliers.

DIAGNOSIS 2

ATTENTION
Make sure there is sufficient refrigerant before going to next priority.