CHECK AND TEST 1
Follow steps in right link to open mainboard cover.
PROCEDURE 1
Unscrew cover of mainboard with a cross-head screwdriver.
Disconnect terminals.
Unscrew the mainboard.
Pull out the buckle to remove the mainboard.
Reverse above steps to install a new mainboard.
PROCEDURE 2
CHECK AND TEST 2
DIAGNOSIS 2
PROCEDURE 3
Unscrew terminal cover.
Remove terminal cover.
Disconnect all terminals.
Unscrew earthing wire.
Unscrew nut of compressor.
Install a new compressor on top
Braze the joints of suction and exhaust pipes.
PROCEDURE 4
Re-braze a copper tube onto processing tube of compressor.
To get more details on
brazing requirements,
please go to Annex B1
Install quick connector onto rebrazed pipe.
Clean away paint on brazed joint.
Cut off the brazed joint of drying filter.
Cut off capillary and remove the cut end by shaking.
Braze on a new drying-filter.
Perform leakage test on brazed joints of drying- filter and processing pipe on compressor.
Vacuum and recharge.
Please get more details
of vacuuming and gas-
charging requirements
on Annex B2
Block processing pipe twice by locking pliers.
Leave locked pliers attached to second block and shake to cut off the remaining pipe.
Braze the ends and remove the pliers.
CHECK AND TEST 3
DIAGNOSIS 3