CHECK AND TEST 1
Discharge refrigerant.
Cut off the charging tube
with pliers.
Discharge all refrigerant toward the exhaust vent.
Melt brazing material with flame and pull
processing tube out using a pair of pliers.
Re-braze a copper tube onto processing tube of compressor. To get more details on brazing requirements, please go to Annex B1
Install quick connector onto rebrazed pipe.
Cut off suction pipe and exhaust pipe.
Power on the compressor and test
exhaust pressure coming from exhaust pipe with a piece of paper.
DIAGNOSIS 1
PROCEDURE 1
Unscrew terminal cover.
Step 2
Remove terminal cover
Unscrew earthing wire.
Unscrew nut of compressor.
PROCEDURE 2
Re-braze a copper tube onto processing tube of compressor.
To get more details on brazing requirements,
please go to Annex B1
Install quick connector
onto re-brazed pipe.
Clean paint off of brazed joint of drying filter.
Cut off the brazed point of drying filter.
Cut off capillary and
remove the cut end by
shaking.
Add quick connector onto processing pipe of
drying-filter.
Conduct a leakage test on brazed joints
of drying-filter and compressor processing
pipe.
Vacuum and recharge.
Click below link to get more details for
vacuuming and gas-
charging requirements,
on Annex B2
Block processing pipe twice by locking pliers.
Leave locked pliers attached to second
block and shake to cut off the remaining pipe.
Braze the ends and remove the pliers.
DIAGNOSIS