PROCEDURE 1
REVERSE STEPS ABOVE
TO INSTALL LED.
PROCEDURE 2
REVERSE STEPS ABOVE
TO INSTALL LED.
CHECK AND TEST 1
DIAGNOSIS 1
CHECK AND TEST 2
DIAGNOSIS 2
CHECK AND TEST 3
DIAGNOSIS 3
PROCEDURE 2
Peel off the sleeves.
Ensure proper wire order and connect.
soldering
Cover connecting point with electrical tape.
CHECK AND TEST 4
After reworking, open one fridge door to see if LED is on or not.
DIAGNOSIS 2