Unscrew the locking
plastic.
Remove the blue plastic.
DIAGNOSIS 1
Cut off the wire.
Peel off the sleeves.
Make sure wires are in proper order and connect them.
Tin soldering.
Cover connecting point with electrical tape.
Perform current leakage test:
Put one detector on earthing wire of socket, and another detector on processing pipe.