CHECK AND TEST 1
When listening, it is evident that the
compressor is louder than normal.
Discharge all refrigerant toward the exhaust vent.
Cut off suction pipe and exhaust pipe.
Step 5
Remove terminal cover.
Remove protector and starter.
Unscrew nut on compressor.
Install a new compressor on top.
Braze the joints of suction and exhaust pipes.
Re-braze a copper tube onto processing tube of
compressor.
To get more details on brazing requirements, please go to 10.4 Annex B1.
Install quick connector onto re-brazed pipe.
Remove paint from brazed joint for drying-filter.
Cut off leaking brazed joint.
Step 6
Braze on a new drying-filter.
Inject nitrogen (1.57Mpa) through quick connector into pipe for at least 3 min to blow remaining refrigerant away.
Add quick connector onto processing pipe of
drying-filter.
Test for leaks on brazed joints of drying-filter and processing pipe on compressor.
Vacuum and recharge.
Click below link to get more details for vacuuming and gascharging requirements,
on 10.5 Annex B2.
Block processing pipe twice with locking pliers.
Leave locking pliers on the second block and
cut off the rest of the pipe by shaking.
Braze the ends and remove the pliers.