CHECK AND TEST 1
Unscrew with cross headscrew driver.
Remove the mainboardcover.
Press SW101 button tostart auto test.
After 40 minutes, testoutput of heater.
Step 5Record the result.The value should beĀ 230V.
PROCEDURE 1
Disconnect the terminals.
Reverse above steps toinstall a new board.