1)Discharge refrigerant: use pliers to cut off charging tube.
2) Discharge all refrigerant
toward the exhaust vent.
Melt brazing material with flame and use a pair of pliers to pull charging tube out.
Get more details on brazing requirements, on Annex B1
Install quick connector onto rebrazed pipe.
Inject nitrogen of 1.57Mpa through quick connector into pipe.
Test brazed joints in compressor niche for leaks with soapy water.
DIAGNOSIS 1
PROCEDURE 1
Clean paint off of brazed joint
Step 2
Cut off brazed joint with
leaking.
CHECK AND TEST 2
Inject 1.57Mpa nitrogen through quick connector into pipe and apply soapy water to test for leaks again.
Check gas leakage with soapy water again at all brazed joints in compressor niche.
DIAGNOSIS 2
PROCEDURE 2
Remove all freezer drawers.
Remove all freezer shelves.
Remove screw covers (total of two) on upper freezer air duct with Slotted Screw Driver.
Unscrew screws (total
of two) on upper freezer
air duct with Cross-head
screw driver.
Catch bottom of air duct upper freezer air duct and pull all buckles (total of 8) down.
Take out upper freezer
air duct by tilting to one
side.
Pay attention to the
connectors when pulling
out the air duct.
Disconnect the terminal for fan motor and move upper freezer air duct away.
Remove the screw cover on bottom freezer air duct with Slotted Screw Driver.
Unscrew the screw on bottom freezer air duct with Cross-head screw driver.
Catch bottom of air duct
bottom freezer air duct
and pull all buckles
(total of 10) down.
Take out the lower air duct, tilting to one side.
When restoring the upper air duct, fasten the wires to avoid crushing them with air duct.
CHECK AND TEST 3
DIAGNOSIS 3
CHECK AND TEST 4
Braze a piezometer onto processing tube of compressor.
Charge nitrogen of 1.57Mpa through quick connector into pipe.
Perform leakage test
on brazing points and
piezometer to make sure
all connection points are
in good condition.
DIAGNOSIS 4
When restoring the upper freezer air duct, fasten the wires to avoid crushing them with air duct.
All buckles should be pushed into proper nal position. If not, please repeat installation.
PROCEDURE 4
Clean paint off of brazed joint of drying filter.
Cut off capillary and remove the cut end by shaking.
Braze a new drying-filter.
Add quick connector onto processing pipe of drying-filter.
Do leaking test on brazed joints of drying-filter and processing pipe on compressor.
Vacuum and recharge.
Click below link to get more details for vacuuming and gas- charging requirements, on Annex B2
Block processing pipe twice by locking pliers.
Leave locked pliers attached to second block and shake to cut off the remaining pipe.
the ends and remove the pliers.
CHECK AND TEST 5
DIAGNOSIS 5