Discharge refrigerant:
1) Use pliers to cut off
charging tube.
2) Discharge all
refrigerant toward the exhaust vent.
Re-braze a copper tube onto processing tube of compressor.
To get more details on
brazing requirements,
please go to Annex B1
Install quick connector onto rebrazed pipe.
Inject nitrogen of 1.57Mpa through quick
connector into pipe.
DIAGNOSIS 1
PROCEDURE 1
CHECK AND TEST 2
DIAGNOSIS 2
PROCEDURE 2
Remove all freezer drawers.
Remove all freezer shelves.
Remove screw covers (total of two) on upper
freezer air duct with Slotted Screw Driver.
CHECK AND TEST 3
DIAGNOSIS 3
CHECK AND TEST 4
DIAGNOSIS 4
PROCEDURE 4
CHECK AND TEST 5
DIAGNOSIS 5