Step 1
Put your hand on
compressor and feel the
vibration.
PROCEDURE 1
Remove terminal cover.
Disconnect all terminals.
Unscrew nut on compressor.
To get more details on brazing requirements, please go to Annex B1.
Braze on a new drying-filter.
Conduct a leakage test on brazed joints
of drying-filter and compressor processing
pipe.
Vacuum and recharge.
Click below link to
get more details for vacuuming and gas- charging requirements to Annex B2.
Block processing pipe twice with locking pliers.
Leave locked pliers attached to second block and shake to cut off the remaining pipe.
CHECK AND TEST 2
DIAGNOSIS 2