Discharge refrigerant:
a) Use pliers to cut
off charging tube.
b) Discharge all refrigerant toward the exhaust vent.
Melt brazing material with flame and pull out processing tube using a pair of pliers.
Re-braze a copper tube onto processing tube of compressor.
To get more details on brazing requirements, please go to Annex B1.
Install quick connector onto processing pipe.
Use a pliers to cut the capillary off.
Inject nitrogen (1.57Mpa)
through quick connector
into pipe.
Check to see if gas is blowing out of capillary.
DIAGNOSIS 1
PROCEDURE 1
Clean paint off of brazed joint of drying lter.
Cut off the brazed joint of drying lter.
Cut off capillary and remove the cut end by shaking.
Braze on a new drying-filter.
Inject nitrogen (1.57Mpa)
through quick connector
into pipe for at least
3 min to blow remaining
refrigerant away.
Add quick connector onto processing pipe of drying- lter.
Test for leaks on brazed joints of drying- lter and processing pipe on compressor.
Vacuum and recharge.
Click below link to
get more details for
vacuuming and gas-
charging requirements,
on Annex B2.
Block processing pipe twice with locking pliers.
Leave locked pliers attached to second block and shake to cut off the remaining pipe.
CHECK AND TEST 2
DIAGNOSIS 2