CHECK AND TEST 1
Voltage between any two phases should be the same (100V~200V).
DIAGNOSIS 1
CHECK AND TEST 2
DIAGNOSIS 2
PROCEDURE 1
Remove terminal cover.
Unscrew earthing wire.
To get more details on brazing requirements, please go to page 682
Install quick connector onto copper tube.
PROCEDURE 2
Clean paint off brazed joint of drying-filter.
Cut off drying-filter.
Braze on a new drying-filter.
Add quick connector onto processing pipe of drying-filter.
Perform leakage test on brazed joints of drying- filter and compressor processing pipe.
CHECK AND TEST 3