Remove terminal cover.
Disconnect all terminals.
Unscrew nut on compressor.
To get more details on brazing requirements, please go to Annex B1.
Weld on a new drying-filter.
Test for leaks on brazed joints of drying-filter and processing pipe on compressor.
Vacuum and recharge.
Click below link to
get more details for vacuuming and gas- charging requirements to Annex B1.
Block processing pipe twice with locking pliers.
Leave locked pliers attached to second block and shake to cut off the remaining pipe.
This Performance Testing Procedures and Assessment Criteria for FC2 Series
Test conditions
1 Ambient temperature and humidity are the same as natural conditions.
2 Sensor position close to air outlet.
3 Testing time 35 or 60 minutes.
4 Set thermostat to MAX.