Step 1
Put your hand on compressor and feel the vibration.
PROCEDURE 1
Open the metal clasp.
Remove terminal cover.
Disconnect all terminals.
Unscrew nut on compressor.
Follow procedures in below to finish the rest.
To get more details on brazing requirements, please go to Annex B1.
Braze on a new drying-filter.
Conduct a leakage test on brazed joints
of drying-filter and compressor processing
pipe.
Vacuum and recharge.
Click below link to
get more details for vacuuming and gas- charging requirements to Annex B2.
Block processing pipe twice with locking pliers.
Leave locked pliers attached to second block and shake to cut off the remaining pipe.
CHECK AND TEST 2
DIAGNOSIS 2