Discharge refrigerant: cut off charging tube with pliers.
Discharge all refrigerant toward the exhaust vent.
Melt brazing material with flame and pull processing tube out with a pair of pliers.
Re-braze a copper tube onto processing pipe of compressor. To get more details on brazing requirements.
DIAGNOSIS 1
Install quick connector onto re-brazed pipe.
Cut off suction pipe and exhaust pipe.
Power up the compressor and feel the exhaust pressure from the exhaust pipe with a piece of paper.
Feel the suction pressure of the suction pipe using a piece of paper.
DIAGNOSIS 1
PROCEDURE 1
Unscrew terminal cover.
Remove terminal cover.
Remove protector and starter.
Unscrew earthing wire.
Unscrew nut of compressor.
Install a new compressor and tighten nuts onto compressor.
Braze the joints of suction and exhaust pipes.
PROCEDURE 2
Clean paint off of brazed joint of drying-filter.
Cut off drying-filter.
Cut off capillary and remove the cut end by shaking.
Braze on a new drying-filter.
Inject nitrogen (1.57Mpa) through quick connector into pipe for at least 3 min to blow remaining refrigerant away.
Add quick connector onto processing pipe of drying-filter.
Perform leakage test on
brazed joints of drying-
filter and compressor
processing pipe.
Vacuum and recharge.
Please get more details
of vacuuming and gas-
charging requirements go to Annex B1
Braze the ends and remove the pliers away.
DIAGNOSIS 2