CHECK AND TEST 1

Step 1

Check whether the tray is full of water. 

DIAGNOSIS 1

PROCEDURE 1 

DIAGNOSIS 2


PROCEDURE 1 

Step 1

Discharge refrigerant: cut off charging tube with pliers.


Step 2

Discharge all refrigerant toward the exhaust vent. 

Step 3

Cut off exhaust pipe. 

Step 4

Attach a new tray onto compressor plate. 

Step 5

Add evaporating pipe to connect the 2 ends of exhaust pipe. 

Step 6

Attach evaporating pipe to tray and weld. 

Step 7

Insert the pipe into the tray. Use a pipe to connect old tray to new tray. 

PROCEDURE 3

Step 1

Melt brazing material with flame and pull processing tube out with a pair of pliers. 

Step 2

Re-braze a copper tube onto processing tube of compressor.

To get more details on brazing requirements, go to ANNEX B1 

Step 3

Install quick connector onto rebrazed pipe. 

Step 4

Clean paint off of brazed joint of drying-filter. 

Step 5

Cut off drying-filter. 

Step 6

Cut off capillary and remove the cut end by shaking. 

Step 7

Braze on a new drying-filter. 

Step 8

Add quick connector onto processing pipe of drying-filter. 

Step 9

Inject nitrogen (1.57Mpa) through quick connector into pipe for at least
3 min to blow remaining refrigerant away. 

Step 10

Do leakage test on brazed joints of drying-filter and processing pipe on compressor. 

Step 11

Vacuum and recharge.

Please get more details of vacuuming and gas- charging requirements, go to ANNEX B1 

Step 12

Block processing pipe twice by locking pliers 

Step 13

Leave locking pliers on the second blocking and cut off the rest pipe by shaking. 

Step 14

Braze the ends and remove the pliers away. 

DIAGNOSIS 3