CHECK AND TEST 1
Voltage between any two phases should be the same (100V~200V).
DIAGNOSIS 1
CHECK AND TEST 2
DIAGNOSIS 2
PROCEDURE 1
Remove terminal cover.
Unscrew earthing wire.
Re-braze a copper
tube onto compressor
processing tube.
Install quick connector onto copper tube.
PROCEDURE 2
Clean paint off brazed joint of drying-filter.
Cut off drying-filter.
Braze on a new drying-filter.
Add quick connector onto processing pipe of drying-filter.
Perform leakage test on brazed joints of drying- filter and compressor processing pipe.
Vacuum and recharge.
To get more details
on vacuuming and recharging
requirements,
please go to Annex page
Braze the ends and
remove the pliers.
CHECK AND TEST 3
DIAGNOSIS 1