Discharge refrigerant:
use pliers to cut off
charging tube.
Discharge all refrigerant toward the exhaust vent.
To get more details on brazing requirements, please go to page 366
Please refer to drawing below to perform leakage test on brazed joints in compressor niche.
DIAGNOSIS 1
Clean paint off near
leaking point.
Cut off the pipe with
leaking point.
Use a bigger copper tube to connect 2 ends of brazed joint.
Weld the 2 ends. Please get more details of brazing requirements on page 366
Perform leakage test on brazed joints again in compressor niche to make sure re-brazing was successful.
CHECK AND TEST 2
Charge nitrogen of 1.57Mpa through quick connector into pipe.
Do leakage test on brazing points and piezometer.
DIAGNOSIS 2
PROCEDURE 2
Cut off drying-filter.
Weld on a new drying- filter.
Vacuum and recharge.
Please get more details of vacuuming and gas- charging requirements on page 313
Block processing pipe twice with locking pliers.
Weld the ends and remove the pliers.
CHECK AND TEST 3
DIAGNOSIS 3
Attention