Discharge refrigerant.
Cut off the charging tube
with pliers.
Discharge all refrigerant toward the exhaust vent.
Melt brazing material
with flame and pull out
processing tube using a
pair of pliers.
Re-braze a copper tube onto processing tube for compressor.
To get more details on brazing requirements, please go to page 366
Feel the suction pressure of the suction pipe using a piece of paper.
DIAGNOSIS 1
PROCEDURE 1
Unscrew terminal cover.
Remove terminal cover
Remove protector and
starter.
Unscrew earthing wire.
PROCEDURE 2
Re-braze a copper tube
onto processing tube for
compressor.
To get more details on brazing requirements, please go to page 366
Weld the joints of suction and exhaust pipes.
PROCEDURE 3
Clean paint off brazed joint of drying-filter
Cut off drying-filter.
Cut off capillary and
shake to remove the cut
end.
Weld on a new drying- filter.
Perform leakage test on brazed joints of drying- filter and compressor processing pipe.
Please get more details of vacuuming and gas- charging requirements on page 313
Block processing pipe twice with locking pliers.
CHECK AND TEST 2
DIAGNOSIS 2
Performance Testing Procedures and Assessment Criteria.
1. Sensor position: Freezer: geometric center of freezer compartment.
2. Test time: 30min to 60min.
3. Stop Gear: compressor-stopping gear must be above the gear listed on the table.
4. Temperature drop must be no less than the value on the table.