PROCEDURE 1
Cut off exhaust pipe and suction pipe.
Power up the compressor and feel the exhaust pressure from the exhaust pipe with a piece of paper.
DIAGNOSIS 1
CHECK AND TEST 2
Braze the joints of
suction and exhaust
pipes.
Melt brazing material
with flame and pull
out processing tube
using a pair of pliers.
Step 3
Re-braze a copper
tube onto compressor
processing tube.
To get more details on
brazing requirements,
please go to Annex B1
DIAGNOSIS 2
CHECK AND TEST 3
Step 1
Cut off one end of
brazed joints.
Step 2
Then, cut off the end
closed to suction end.
DIAGNOSIS 3
PROCEDURE 2
Use a larger copper tube to connect 2 ends of brazed joint.
Cut off capillary and
shake to remove the cut
end.
PROCEDURE 3
Click below link to get more details for vocuuming and gas-charging requirements, go to Annex B2
Block processing pipe
twice with locking pliers.
Step 9
Leave locking pliers on
the second block and
cut off the rest of the
pipe by shaking.
DIAGNOSIS 4