NO-FROST
CROSS 4-DOOR WITH INVERTER COMPRESSOR
CROSS 4-DOOR WITH NORMAL COMPRESSOR
TOP MOUNT WITH INVERTER COMPRESSOR
TOP MOUNT WITH NORMAL COMPRESSOR
TOP MOUNT WITH NORMAL COMPRESSOR
(US Style)
FRENCH 4-DOOR WITH INVERTER COMPRESSOR
FRENCH 4-DOOR WITH NORMAL COMPRESSOR
COMBI WITH NORMAL COMPRESSOR
COMBI WITH INVERTER COMPRESSOR
COMBI WITH NORMAL COMPRESSOR E-DAMPER
SIDE BY SIDE WITH INVERTER COMPRESSOR
SIDE BY SIDE WITH NORMAL COMPRESSOR
SINGLE-DOOR FREEZER
(EU Style)
SINGLE-DOOR FREEZER
(US Style)
SINGLE-DOOR LARDER
(EU Style)
DEFROST
COMBI
TOP MOUNT
CHEST FREEZER
SINGLE-DOOR FRIDGE
SINGLE-DOOR FREEZER
SINGLE-DOOR LARDER
BUILT-IN COMBI
BUILT-IN TOP MOUNT
BUILT-IN ELECTRONIC SINGLE-DOOR LARDER
BUILT-IN ELECTRONIC SINGLE-DOOR FRIDGE
BUILT-IN MECHANIC SINGLE-DOOR LARDER
BUILT-IN MECHANIC SINGLE-DOOR FRIDGE
FROST FREE
COMBI WITH INVERTER COMPRESSOR
COMBI WITH NORMAL COMPRESSOR
SUPPORT
LOG-OUT
PROCEDURE 1
Step 1
Unscrew bottom
attachment.
Step 2
Unscrew bottom
attachment.
Step 3
Remove the plastic
cover.
Step 4
Unscrew central
attachment on left and
right side.
Step 5
Unscrew the plastic
guider.
Step 6
Hold cabinet and pull
appliance out.
Note:
Reverse procedures
above to install the
appliance.
CHECK AND TEST 1
Step 1
Check whether the tray
is full of water.
DIAGNOSIS 1
PROCEDURE 1
Step 1
Check with Homa to
see if a larger tray is
available.
If so, replace existing tray
with a larger one.
DIAGNOSIS 2
PROCEDURE 2
Step 1
When a bigger tray isn't
available, please check
to see if is enough space
in compressor niche for
an additional tray.
DIAGNOSIS 3
PROCEDURE 2
Note
Step 1
Discharge refrigerant.
Cut off the charging tube
with a pair of pliers.
Step 2
Discharge all refrigerant
toward the exhaust vent.
Step 3
Melt brazing material
with flame and pull out
processing tube using a
pair of pliers.
Note
Step 4
Re-braze a copper
tube onto compressor
processing tube
To get more details for
brazing requirements,
please go to
Annex B1
Step 5
Install quick connector
onto re-brazed pipe.
Step 6
Inject nitrogen (1.57Mpa)
through quick connector
into pipe.
Step 7
Cut off exhaust pipe.
Step 8
Attach a new tray onto
compressor plate.
Step 9
Add evaporating pipe to
connect the 2 ends of
exhaust pipe.
Step 10
Attach evaporating pipe
to tray and braze.
Step 11
Add extra pipe to
connect the trays.
PROCEDURE 3
Step 1
Clean paint off brazed
joint of drying-filter.
Step 2
Cut off drying-filter.
Step 3
Cut off capillary and
shake to remove the cut
end.
Step 4
Braze on a new
drying-filter.
Step 5
Inject nitrogen (1.57Mpa)
through quick connector
into pipe for at least 3
min to blow remaining
refrigerant away.
Step 6
Add quick connector
onto processing pipe of
drying-filter.
Step 7
Perform leakage test on
brazed joints of dryingfilter
and compressor
processing pipe.
Step 8
Vacuum and recharge.
Click below link to
get more details for
vacuuming and gascharging
requirements,
go to
Annex b2
Step 9
Block processing pipe
twice with locking pliers.
Step 10
Leave locking pliers on
the second block and
cut off the rest of the
pipe by shaking.
Step 11
Braze the ends and
remove the pliers.
DIAGNOSIS 4