CHECK AND TEST 1
Unscrew cover of mainboard with a Cross-head screwdriver.
Test resistance of
potentiometer from
“Dor1” and “GND”.
Step 3
Turn the knob from 0 to
max to test resistance of
potentiometer.
PROCEDURE 1
Remove shelves.
Remove chill box.
Remove chill flap.
Lever 2 decorative strips
off and remove.
Remove the 4 screws.
Pull out fridge air duct.
Disconnect the terminals.
Step 9
Disconnect the terminal.
CHECK AND TEST 2
Check to see if terminals
are pushed into final
position.
If not, repeat.
Check to see if terminal on fridge wall is filled with foam.
Step 3
If so, use tweezers to
remove the foam.
Connect the 2 ends (“Dor1” and “GND”) of terminal for potentiometer.
Check the connections of wires for potentiometer.
DIAGNOSIS 1
CHECK AND TEST 3
Measure resistance of
potentiometer on each
gear.
DIAGNOSIS 2
When reinstalling fridge air duct, first put the positive end of buckle on the top into the negative ends.
Then put the positive end of buckle on the sides into the negative ends.
Lastly, fasten the buckles on the sides by knocking them in.
DIAGNOSIS 1